Hardware and Software
No, this is not a euphimistic post.
My new server hardware arrived today. The whole thing, including the half-height rack with the pullout monitor and keyboard. I was also surprised to find that I’d been smart enough to get a server-grade UPS. I thought I’d forgotten that, but, luckily, when I started getting these quotes so many months ago, I’d been smart enough to get that added in. Yea for Jim’s hind-brain-server-ordering-autopilot! Yea!
So, tomorrow, it’s jeans a day early so I can run the cables through the dropped ceiling to where the rack will live. And, it’ll be taking everything out of boxes and getting it into the rack and configured. If I’m lucky, my software will arrive tomorrow. At least, it would be nice to have my Novell Open Enterprise Server and SuSE Linux to install. The backup software, from Syncsort, and the network attached storage devices that I’ll be backing up to would be nice, but they’re not as important as the operating system. I hope, for obvious reasons.
After that’s done, all I have to do is figure out how to migrate everything from the cranky, old Windows NT install and still have all the Windows XP machines and Apples talking to the server. No problem.
I hope.